Home › References › Nilüfer Municipality, Gölyazı
Nilüfer Municipality, Gölyazı
Petrol and electric trains built for visitors to the Gölyazı recreation area and historic village.
First train (2015)
A single-wagon petrol train for 32 passengers, delivered for the visitor route in the traffic-free Gölyazı area.
Electric train (2016)
An electric train with two wagons of 20 passengers each, carrying 40 passengers in total and air brakes. Its zero-emission operation suits the recreation area and the historic setting. A full charge on a standard charger takes 8 hours, and a fast charger reaches about 80% in 30 minutes.
Two different trains in Gölyazı
For visitors to the Gölyazı recreation area and historic village, a petrol train was delivered first in 2015, followed by an electric train in 2016. Both trains run on the visitor route in the traffic-free area.
Power system
The electric train uses an 80 kW motor and a 24 kWh lithium-ion battery. Quiet, exhaust-free operation suits the recreation area and the historic setting.
For a similar municipal project
A similar solution can be planned for traffic-free routes such as recreation areas, historic villages or natural surroundings. When you share the route, gradient and passenger numbers, a preliminary assessment is made.
Frequently asked questions
Which trains run in Gölyazı?
A 32-passenger petrol train delivered in 2015 and a 2×20 = 40-passenger electric train delivered in 2016.
How long does the electric train take to charge?
A full charge on a standard charger takes 8 hours, and a fast charger reaches about 80% in 30 minutes.
Why is electric suitable for a historic village?
The electric train runs quietly and produces no exhaust gas, which suits the recreation area and the historic setting.