Home › References › Nilüfer Municipality, Gölyazı

Nilüfer Municipality, Gölyazı

Petrol and electric trains built for visitors to the Gölyazı recreation area and historic village.

2015, petrol, 32 passengers2016, electric, 2×20 = 40 passengers80 kW motor, 24 kWh lithium battery

First train (2015)

A single-wagon petrol train for 32 passengers, delivered for the visitor route in the traffic-free Gölyazı area.

Electric train (2016)

An electric train with two wagons of 20 passengers each, carrying 40 passengers in total and air brakes. Its zero-emission operation suits the recreation area and the historic setting. A full charge on a standard charger takes 8 hours, and a fast charger reaches about 80% in 30 minutes.

Two different trains in Gölyazı

For visitors to the Gölyazı recreation area and historic village, a petrol train was delivered first in 2015, followed by an electric train in 2016. Both trains run on the visitor route in the traffic-free area.

Power system

The electric train uses an 80 kW motor and a 24 kWh lithium-ion battery. Quiet, exhaust-free operation suits the recreation area and the historic setting.

For a similar municipal project

A similar solution can be planned for traffic-free routes such as recreation areas, historic villages or natural surroundings. When you share the route, gradient and passenger numbers, a preliminary assessment is made.

Frequently asked questions

Which trains run in Gölyazı?

A 32-passenger petrol train delivered in 2015 and a 2×20 = 40-passenger electric train delivered in 2016.

How long does the electric train take to charge?

A full charge on a standard charger takes 8 hours, and a fast charger reaches about 80% in 30 minutes.

Why is electric suitable for a historic village?

The electric train runs quietly and produces no exhaust gas, which suits the recreation area and the historic setting.